Hello All,
I'm at a VFX house and we just switched to using Shotgun, but I seem to not be able to do what I want to.
In the tasks view, I see all the tasks that I have assigned to various artists to be completed. However, they are all showing up under one tab labeled "no shots".
Each of these tasks is linked to a shot in the shots tab. Each task linked to each shot and each shot as repeated tasks. Having them all in the same pool of tasks then becomes confusing.
I'll give you an example.
In shots I have
• Shot 1
- Model
-Texture
-Animate
-etc
• Shot 2
- Model
-Texture
-Animate
-etc
Then In my tasks tab, I just see:
•No Shots
-Model
-Model
-Texture
-Texture
-Animate
-Animate
-etc
-etc
How can I fix this problem, I'd like to see in my tasks tab each task under the shot it is linked to in the shots tab, so I can use the Gantt Display and Dependencies more easily.